Getting to the last stages of the build now! All lighting is now complete, seats are in and the roof has been fitted.
It was only when it came down off the stands did I realise how low it really is, but it is not too low to go over the local speed bumps because I took it for a 'blat' (a kit car term apparently which means a run) and forgot all about the bumps as I was so intent on keeping the engine running I set off at a fair lick and was over them before I realised!
No real problems with the build now that I am well versed in the 'caterham way'!
The car is booked to go into Caterham for the Post Build Check (PBC) on the 2nd August but that means I have to have completed all of the registration requirements such as putting covers over all the bolt heads, tape on all electrical wiring, rubber trimming all exposed edges etc. etc. and of course getting it trailered down there. Should be on the road towards the end of August I reckon.
No comments:
Post a Comment